The following case studies highlight some of the recent projects carried out by Safe Site Security Solutions. If you have any questions regarding any of the case studies listed below please feel free to contact us.

White Hart Lane – Illegal Parking

Concrete barriers at White Hart Lane

The Brief A large area of vacant land in North London was being used by some for illegal parking. The land is very close to the Tottenham Hotspur Football Club ground (White Hart Lane) and so illegal parking was especially prevalent on match days when around 60,000 spectators visited the area and prime-location parking was scarce. SafeSite Security Solutions were tasked with securing the land and preventing illegal entry and parking. The Solution SafeSite Security Solutions proposed that two large concrete barriers be positioned on the…

Boarding Up Medical Centre in London

Boarded up medical facility

The Brief Secure a very large medical centre in London with steel boarding and security fencing. The aim of this is to both act as a deterrent to squatters or to any one wanting to gain unlawful entry into the property, as well as preventing external and internal damage from vandals. The Solution At the request of the insurance company that provide cover for the building, all of the entry points, including windows, were boarded up with steel. This steel is…

Steel Boarding Up in Croydon

Steel boarding up large house

The Brief Secure a large 4 bed detached house in Croydon at both ground and first floor level. Provide a level of protection that will prevent squatters from gaining access to the vacant property and stop vandals doing any damage to windows or doors. The Solution Steel boarding was the material of choice as this was stipulated by the building’s insurance company. The strong metal security screens can be quickly and easily cut to size on site and provides a…

Large Factory Boarding Up in Manchester

West Side of Factory in Bolton

The Brief We were contacted by Greater Manchester City Council to propose a solution to prevent vandalism to a large, vacant factory unit. With a large glass entrance and numerous doors and windows to protect, the council required a fast, cost effective way to protect the vacated property from both external and internal damage by local youths and vandals. The Solution With budget a key consideration, Safe Site Facilities recommended boarding up all doors and windows with timber. A cheaper…